Volunteer Projects - 2022
Projects Finalised in 2022
1: Constructed 10 steel day yards alongside of Evening Peal Car park
To keep horses safe rather than tying up against a float. Officially opened by Cr Michelle Rich (the SJ Shire President) on the 8 July 2022.
2: Erected safety gates and fence on trail butting Wungong South Road.
Two gates were erected either side of the Birriga Brook. Aim, to stop loose horses crossing onto Wungong South Road which will become busier in the next few years. Horse riders able to open and shut gates.
3: Erected safety gates and fence at the end of Kentucky Drive Trail.
Aim to stop loose horses crossing onto Thomas Road. Horse riders able to open and shut gates.
4: Install a manure pit alongside day yards to reduce manure being left in the car park grounds and under trees.
5) Acquired a SJ Shire heavy duty Toro mower, so volunteers can continue to maintain the grounds of the DDEE.